5 Steps to Build a Power Plant in Spain

The 5 steps to build a power plant in Spain include: securing land rights, requesting access points and network connection, depositing the guarantees, preparing environmental studies and obtaining permits and licenses

The EPC contract versus the EPCM contract

Determining the ideal contract for an EPC (Engineering, Procurement, and Construction) project has a direct effect on the risks and costs of the project and can condition the efficiency of the execution of the work.

The Development Phase of a Photovoltaic Project in Spain

Photovoltaic projects in Spain require a pre-construction phase. Phase I consists of the provision of “development services” based on obtaining the necessary permits, licenses and authorisations to initiate the execution of the plant.

Renewable energy: The contract for the transfer of surface rights

The installation of photovoltaic power stations (solar parks) or wind energy farms requires the formalisation of a contractual relationship between the developer and the owner of the designated land. Through its advantages, the contract for the transfer of surface rights has acquired great prominence over sale or rental contracts.